CBICT

- Capacity building through ICT

STATUS | Completed
STATUS DATE | 09/12/2014
ACTIVITY CODE |
CBICT

Objectives

The eight Millennium Development Goals (MDGs) – which range from halving extreme poverty to halting the spread of HIV/AIDS and providing universal primary education, all by the target date of 2015 – form a blueprint agreed to by all the world’s countries and all the world’s leading development institutions.

The Millennium Development Goals, together with the World Summit on the Information Society (WSIS ) have paved the way to a number of Capacity Building (CB) projects related to ICT in developing countries. Satcom technology and knowledge can contribute to achieving education worldwide, especially in area or regions that have no or a bad infrastructure.

For ESA, this study activity has the underlying goal to identify how to federate and catalyse a major line of actions to be undertaken with the participation of 3rd party institutions in line with the action plan proposed by the UN.

The goal of this project is to define and validate a reference model for CB projects using satellite communications (Satcom).


click for larger image

Challenges

In order to create this reference model, 5 challenges have been identified and further refined:

  1. What are the sectors that can benefit from capacity building projects through ICT?
  2. In which one(s), could Satcom be an added value?
  3. What is the holistic description of these sectors?
  4. Is there a reference model for successful capacity building projects using Satcom?
  5. How to validate the reference model?

Plan

T0 (start of the project is 5th March 2008). The planning below is in months:

  1. Identification and Selection of Potential CB Sectors: i.e. User Needs, Applications and Utilisation Scenarios
    Timeline: T0 till T0+2
  2. Characterisation of the Selected Sectors
    Timeline: T0+2 till T0+5
  3. Definition of Reference Model for Capacity Building Projects
    Timeline: T0+5 till T0+9
  4. Application and Assessment of the Reference Model (for 2 projects in parallel.
    Timeline: T0+9 till T0+21
  5. Review and Finalisation of the Reference Model, and Recommendations for Future Actions on Capacity Building
    Timeline: T0+20 till TO+22

Current Status

The deliverables of the main contracts have been finalised and are available in the links on the right side of this page. The deliverables include the Reference Model, in the form of an interactive PDF document which is aimed to assist in the conception, design and implementation of capacity building projects.

The Reference Model includes:

  • A set of checklists to successfully deploy ICT solutions in developing countries. These checklists span four sectors in particular (healthcare, education, civil society, governance) and include elements such as risk analysis, sustainability issues, ownership and project management.
  • Numerous pointers that provide additional information about specific topics (e.g. round table process). Templates are also presented to facilitate the application of the concepts proposed by the reference model.

The activities for the development of the Business Model (covered by the Contract Change Notice #1) aimed at investigating the provision of CBICT sustainable services are currently ongoing. The WPs dealing with the Characterisation of the Problem and the Inventory of Service Offerings and Need by NGO’s are under finalisation. A first draft of the WP report covering the Definition of Alternative Models for Addressing the Problem is being produced by the team.