STRATIFY Simulator of Very High Throughput Satellite with Flexible Payload

  • Status
    Ongoing
  • Status date
    2025-06-10
  • Activity Code
    3A.105
Objectives

The Project develops and validates end-to-end performance simulators for flexible Very High Throughput Satellites embarking active antennas and digital processors.

Challenges

The simulator assesses VHTS payload performance in the far field with realistic signal excitation, focusing on architectural and functional performance with emphasis on high simulation speed.

Benefits

Improvement and fasten the analysis and design phase in VHTS systems implementation.

Features
  • Implementation of most significant simulator performances.
  • Capability to be used for huge VHTS mission reference scenarios.
  • Large flexibility in the input parameters configuration.
  • Adaptability in diverse scenarios configuration also in the NGSO contexts.
System Architecture

High-level architecture of STRATIFY Simulator is based on an Object-Oriented development approach based on the organisation and implementation of module representative of typical VHTS system mainly for the space segment as in following figure:

Simulator Object-Oriented Development Approach

 

 

 

 

 

 



STRATIFY Simulator basic software architectu
re


The STRATIFY Simulator workflow management is the main tasks of the Orchestrator module and it aims to overcome the sequential approach in the configuration and execution of the modules simulating the sub-systems composing the E2E VHTS System. In this way is possible to take advantage of the opportunity to parallelise some processing common between each module. This orchestrator role is detailed in following figure:

 

STRATIFY Simulator basic software architecture

 

 

 

 

 

 



STRATIFY Simulator modules interoperability


The Orchestrator functionalities are complemented by the data format used for configuring the simulator and for managing the information produced and exchanged by the various modules.

Plan

The contractual milestones implemented in the Project frame execution after the Kick-Off are:

  • Progress Meeting 1 (PM1)
  • Mid Term Review (MTR)
  • Progress Meeting 2 (PM2)
  • Progress Meeting 3 (PM3)
  • Final Review (FR)
Current status

The Project has been concluded end of 2024.