Click on the title to download each presentation.
Day 1
12 December 2011
Time | Category | Title | Company |
11:00 | START | ||
Welcome and introductions | ESA | ||
Future Systems | BB-MED, a broadband solution for the Union for the Mediterranean. | Avanti | |
Future Systems | Arctic Communications Requirements. | SINTEF | |
12:30 | LUNCH | ||
Future systems | High speed Bi-way Mobile Satellite Systems for Public Safety and Security Applications. | Logica-UK | |
Future systems | High speed Bi-way Mobile Satellite Systems for Public Safety and Security Applications. | Astrium-F | |
15:00 | BREAK | ||
Payload | Payload Simulation Tool for Complex RF Front End Architectures. | Space Engineering | |
Payload | Next Generation Telecommunication Payloads Based on Photonic Technologies. | TAS-I | |
17:00 | BREAK | ||
OBP | Evolution of on board processor applications. | Telesat | |
OBP | ARTES 1 Rolling Workplan for 2012 | ESA | |
18:00 | Buffet and Drinks |
Day 2
13 December 2011
Time | Category | Title | Company |
09:00 | START | ||
Future Systems | SATNEX III overview and main results. | DLR | |
Future Systems | Modular Design of Telecom Satellites. | TAS-I (TBC) | |
11:30 | BREAK | ||
Aero | Cost benefit analysis for non-safety satellite based aeronautical services - Single Pilot communications and UAV's. | TriaGnoSys | |
Aero | Interworking in the ATN for future aeronautical data communication system. | AirTel | |
12:30 | LUNCH | ||
Optical | Feasibility Assessment of Optical Technologies and Techniques for Reliable High Capacity Feeder Links. | DLR | |
Optical | Feasibility Assessment of Optical Technologies and Techniques for Reliable High Capacity Feeder Links. | Joanneum | |
14:30 | BREAK | ||
Payload | NG payloads on Active Array Antenna Technology. | EADS-CASA | |
Future Systems | Next Generation Broadcast Interactive Network. | Space Engineering | |
16:00 | END |