PAGE CONTENTS
Objectives
The activity is a follow up activity of the precursor SatcomWeather project with the focus on product development but also on additional de-risk activities
The main objectives are to develop the algorithms and infrastructure to calculate products such as
- installation quality,
- footprint move (on Earth surface), an

- empiric update of link budget maps (in contrast to model based link budgets) and an
- empiric validation of the footprint form.

Side products which are developed include
- local signal level estimations,
- rain detection,
- signal level change detections and
- a comparison of signal quality measurements of different VSAT systems
Challenges
Design, implement and operate the HW and SW infrastructure to enable access to the given amount of data of >20.000 stations over more than two years.
Develop, implement, test, optimize the above-mentioned products. The validation is the biggest challenge as no external validation seems possible.
System Architecture
The system architecture is distributed as shown in the picture.

Plan
De-risk project phase
- MS1 preliminary design review
- MS2 infrastructure review meeting
- MS3 final review
Product development phase
- MS4 critical design review
- MS5 Test readiness review
- MS6 Factors acceptance test (final review)
Current Status
The project is closed.